Client: STAKLOPAKET-TA EOOD,
MK – 400 tons
Deadline: 2 months
D.Chiflik, Avren, Dalgopol and Devnya. Within 4 days, the “Intercom Group” team managed to produce, deliver and install a new water pipe.
The total produced amount of metal structures for the construction for the period 2014 – 2015 has a weight of 2500 tons. The manufactured structure was installed in the mountainous part of the border. The construction consists of supporting columns with a branch, connecting plates and panels – 3000×5000 mm and 2000×3000 mm, taking into account the slopes of the terrain.
ANNOUNCEMENT to interested persons and the public
Pursuant to Art. 4, para. 1 in connection with para. 3 of the Ordinance on the conditions and procedures for carrying out an environmental impact assessment
“INTERCOM GROUP” Ltd. announces that information has been prepared according to Appendix No. 2 for an investment proposal: “Reclamation of disturbed terrain PI No. 61741.18.14, according to the KKKR of the village of Razdelna, the town of “Bodjaka”, Beloslav municipality, Varna region”. The information is available to interested parties every working day from 15.03.2023 to 18.04.2023 from 11:00 a.m. to 12:00 p.m., at the address of the Contracting Authority: Varna, Mladost district, Eng. Pavlin Nikolov” No. 11, Written statements and opinions are accepted at the same address and/or email: office@intercomgrup.bg
Възложител: ТЕЦ Варна
Изработване и доставка на три комплекта въздухоподгревател I степен. Всеки комплект се състои от 8 /осем/ броя крайни куба и 32 /броя/ средни куба. Кубовете трябва да се изработят съгласно спецификация, технически изисквания и чертежи.
Срок за изпълнение: 6 месеца
MK: about 230 tons, connection between existing reinforced concrete columns from the end of 1980 with a new roof and a new hall
production + installation: term 4 months.